NEW QUESTION # 30
Generic Parent Generic 1 pt
What is the purpose of collective orders?

  • A. To combine order management of co-products and by-products with the main product
  • B. To manage production orders for an entire finished product on multiple levels
  • C. To post production costs on a cost collector instead of the production order
  • D. To post any component withdrawal as single backflush with order confirmation

Answer: B


NEW QUESTION # 31
Your project team decided to use a make-to-order planning strategy material in discrete manufacturing.
what is the impact of this decision?
Note: there are 2 correct answers to this question

  • A. Storage Location MRP areas are required for sales-orders-specific stock.
  • B. Production orders are created with sales order reference.
  • C. Both the reduction of make-to-order stock and requirements occur on delivery
  • D. Net requirement calculation is carried out for every sales order individually.
  • E. Sales orders have to be ATP-confirmed (available-to-promise) to saved.

Answer: B,D

Explanation:
In make-to-order production, the production planning is initiated only when a sales order is received. The system does not perform a net requirements calculation between individual sales orders or with the make-to-stock warehouse stock1. Therefore, option B is correct. Additionally, production orders are created with sales order reference, which means that the costs and revenues of the sales order are settled at the end of the production process2. Therefore, option E is also correct. The other options are not valid for make-to-order production. Storage location MRP areas are not required for sales-order-specific stock, as the stock is managed at the sales order level3. The reduction of make-to-order stock and requirements does not occur on delivery, but on goods issue to the sales order1. Sales orders do not have to be ATP-confirmed to be saved, as the availability check is optional and can be performed later. References: 1: Strategies for Make-to-Order (MTO) Production | SAP Help Portal(https://help.sap.com/docs/SAP_S4HANA_CLOUD/2bba750d1e124e1ea2a039bb1cd9b6c5/3b24bf53d25a Outlining Make-to-Order Production - SAP Learning(https://learning.sap.com/learning-journeys/discovering-the-basics-of-sap-s-4hana-manufacturing/outlin Storage Location MRP Areas | SAP Help Portal. : Availability Check and Requirements in Sales and Distribution Processing | SAP Help Portal.


NEW QUESTION # 32
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.

  • A. Execute an infinite production planning run for the critical resources.
  • B. Increase the capacity supply in a time-phased interval.
  • C. Form optimum sequence to reduce setup times.
  • D. Determine a time period with available capacity on the planning board.
  • E. Reduce the planning Window.

Answer: B,C,D

Explanation:
Increase the capacity supply in a time-phased interval: You can use the capacity planning table or the capacity planning board to increase the available capacity of a resource by changing the shift sequence, the shift duration, or the number of individual capacities. You can also use the capacity leveling function to distribute the capacity requirements over a longer time horizon. This way, you can avoid capacity overloads and create a balanced capacity load.
Determine a time period with available capacity on the planning board: You can use the planning board to visualize the capacity load and the capacity availability of a resource in a graphical Gantt chart. You can use the filter and zoom functions to focus on a specific time period and resource. You can also use the capacity evaluation function to display the capacity situation in a tabular or graphical form. This way, you can identify the time periods with available capacity and plan the operations accordingly.
Form optimum sequence to reduce setup times: You can use the setup matrix or the setup group key to define the setup times and the setup categories for a resource. You can also use the setup optimization function to determine the optimum sequence of operations that minimizes the total setup time. This way, you can reduce the capacity consumption and increase the throughput of the resource. References: Identifying the Basic Principles and Tools of Capacity Planning; SAP Help Portal;
[SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 82.


NEW QUESTION # 33
Which business processes are affected by settings in the order-type-dependent parameters?
Note: There are 2 correct answers to this question.

  • A. Schedule production orders.
  • B. Select master data.
  • C. Check material availability.
  • D. Define integration with cost accounting.

Answer: A,C

Explanation:
The order-type-dependent parameters are configuration settings that control various aspects of production order processing, such as number range, scheduling type, availability check, costing variant, confirmation parameters, and so on. These parameters are assigned to a production order type, which is a key that defines the characteristics and business rules of a production order. The order-type-dependent parameters affect the following business processes:
Check material availability: The availability check determines whether the required materials and capacities are available for the production order. The availability check is controlled by the checking rule and the checking group, which are defined in the order-type-dependent parameters. The checking rule specifies which stocks, receipts, and issues are considered in the availability check. The checking group determines how the system responds to the availability situation, such as issuing a warning or an error message, or rescheduling the order.
Schedule production orders: The scheduling of production orders calculates the planned dates and times for the operations and the order. The scheduling is controlled by thescheduling type and the scheduling parameters, which are defined in the order-type-dependent parameters. The scheduling type determines whether the system performs forward or backward scheduling, and whether it considers the basic dates or the production dates. The scheduling parameters determine how the system calculates the operation durations, interoperation times, and floats. References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 123; [SAP Help Portal: Order-Type-Dependent Parameters].


NEW QUESTION # 34
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 Correct answers to this question?

  • A. MRP type
  • B. MRP Groups
  • C. Procurement Type
  • D. Material Type

Answer: A,C

Explanation:
The master data fields that can have an impact on whether MRP creates planned orders or purchase requisitions for a material are:
MRP type: The MRP type is a parameter that defines how a material is planned by MRP. Depending on the MRP type, MRP can create different types of procurement proposals for a material. For example, if the MRP type is PD (MRP), MRP can create either planned orders or purchase requisitions, depending on the procurement type of the material. If the MRP type is VB (Reorder Point Planning), MRP can only create purchase requisitions, regardless of the procurement type of the material.
Procurement type: The procurement type is a parameter that defines how a material is procured, either internally or externally. Depending on the procurement type, MRP can create different types of procurement proposals for a material. For example, if the procurement type is E (External Procurement), MRP can only create purchase requisitions for a material. If the procurement type is X (Both Procurement Types Possible), MRP can create either planned orders or purchase requisitions, depending on the source of supply determination.
The master data fields that do not have an impact on whether MRP creates planned orders or purchase requisitions for a material are:
MRP groups: The MRP groups are parameters that allow you to group materials with similar planning characteristics and assign them common MRP settings, such as planning horizon, lot-sizing procedure, or planning calendar. The MRP groups do not directly affect the type of procurement proposals created by MRP, but they can influence the quantity and timing of the requirements and receipts.
Material type: The material type is a parameter that defines the attributes and properties of a material, such as valuation class, price control, or account determination. The material type does not affect the type of procurement proposals created by MRP, but it can influence the valuation and accounting of the material movements.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 87; [SAP Help Portal: MRP Type] and [SAP Help Portal: Procurement Type].


NEW QUESTION # 35
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question

  • A. Queue
  • B. Teardown time
  • C. Setup Time
  • D. Move time

Answer: A,D


NEW QUESTION # 36
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?

  • A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward
  • B. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
  • C. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
  • D. The new operation is inserted at the desired time; the previous dispatched operation is moved forward.

Answer: A

Explanation:
The graphical planning table is a tool for capacity planning and scheduling that displays the operations and the work centers in a time-oriented view. You can use the graphical planning table to create, change, or dispatch operations manually or automatically. The planning direction determines whether the operations are scheduled from the start date or the finish date of the order. If the planning direction is forward, the operations are scheduled from the start date of the order1.
If you want to insert an operation at a certain time on a work center in the graphical planning table, and the planning direction is forward, and the desired dispatching time coincides with an operation that has previously been dispatched, the insertion takes place as follows:
The new operation is inserted at the desired time; the previously dispatched operation is moved backward (B): This is the correct answer. The system inserts the new operation at the specified time and shifts the previously dispatched operation to a later time, so that the sequence and the capacity requirements of the operations are maintained. The system also adjusts the start and finish dates of the order and the subsequent operations accordingly2.
The other options are not correct for the following reasons:
The new operation is inserted at the desired time; the previous dispatched operation is moved forward (A): This is not correct. The system does not move the previously dispatched operation to an earlier time, as this would violate the planning direction and the capacity constraints of the work center.
The system only moves the previously dispatched operation to a later time, as explained in option B.
The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation : This is not correct. The system does not insert the new operation after the previously dispatched operation, as this would not match the desired dispatching time specified by the user. The system inserts the new operation at the desired time and moves the previously dispatched operation backward, as explained in option B.
The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation (D): This is not correct. The system does not insert the new operation before the previously dispatched operation, as this would violate the planning direction and the capacity constraints of the work center. The system inserts the new operation at the desired time and moves the previously dispatched operation backward, as explained in option B.
References:


NEW QUESTION # 37
How would you define pegging in the context of Advanced Planning?

  • A. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
  • B. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
  • C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements
  • D. An evaluation to verify if there are material or capacity shortages in the ^ network after the production planning run

Answer: B

Explanation:
Pegging is a term used in Advanced Planning to describe the relationship between the receipt and the issue elements of a product within a location. Receipt elements are planning elements that increase the stock of a product, such as production orders, purchase orders, or stock transfers. Issue elements are planning elements that reduce thestock of a product, such as sales orders, planned independent requirements, or reservations.
Pegging links the receipt and issue elements according to the bill-of-material structure of all related products and represents the material flow through all levels of production. Pegging enables the system to identify and display quantity and date/time problems, such as shortages or delays, and to forward scheduling changes to other dependent elements. Pegging also forms the basis for the availability check and the capacity check in Advanced Planning12.
References:
1: SAP Help Portal: Pegging
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 4: Advanced Planning


NEW QUESTION # 38
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 Correct answers to this question?

  • A. MRP type
  • B. MRP Groups
  • C. Procurement Type
  • D. Material Type

Answer: C,D


NEW QUESTION # 39
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question

  • A. Change the item category of the phantom assembly in the bill of material *-' (BOM)
  • B. Define the special procurement type inside the material master.
  • C. Change the phantom item indicator for the phantom assembly in the bill of material (BOM)
  • D. Define the special procurement type inside the BOM

Answer: B,C

Explanation:
A phantom assembly is a material that is not physically produced, but its components are directly consumed in the production of a higher-level material. To set up a material as a phantom assembly, you need to do the following steps:
Define the special procurement type as 50 (phantom assembly) in the material master of the phantom assembly. This indicates that the material is not procured or produced, but its components are exploded in the BOM of the higher-level material.
Change the item category of the phantom assembly in the BOM of the higher-level material to N (phantom item). This indicates that the phantom assembly is not relevant for production order or MRP, but its components are.
Alternatively, you can change the phantom item indicator for the phantom assembly in the BOM of the higher-level material to X (phantom assembly). This has the same effect as changing the item category to N, but it also allows you to use the same BOM for different purposes, such as costing or sales.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 68;
[SAP Help Portal: Phantom Assembly].


NEW QUESTION # 40
Which information is required when you create a product master in SAP S/4HANA?
Note: There are 2 correct answers to this question.

  • A. Selection screen for views
  • B. Selection screen for plants
  • C. Base unit of measure
  • D. Product type

Answer: C,D

Explanation:
When you create a product master in SAP S/4HANA, you need to enter values for mandatory fields such as product number, product type, base unit of measure, and description. The product type determines the category of the product, such as material, service, or article. The base unit of measure defines the unit in which you manage the product in all business transactions. The selection screen for views and plants are optional fields that allow you to choose which views and plants you want to maintain for the product master. References: Creating Products, Understanding the Concept of Master Data


NEW QUESTION # 41
In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.

  • A. Planning mode
  • B. Fixed pegging
  • C. Finiteness level
  • D. Direction
  • E. Scheduling control

Answer: A,D,E


NEW QUESTION # 42
Your project team decided to use a make-to-order planning strategy material in discrete manufacturing.
what is the impact of this decision?
Note: there are 2 correct answers to this question

  • A. Storage Location MRP areas are required for sales-orders-specific stock.
  • B. Sales orders have to be ATP-confirmed (available-to-promise) to saved.
  • C. Production orders are created with sales order reference.
  • D. Both the reduction of make-to-order stock and requirements occur on delivery
  • E. Net requirement calculation is carried out for every sales order individually.

Answer: B,C,E


NEW QUESTION # 43
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have?
Note: There are 3 correct answers to this question.

  • A. Model a transportation lane and carrier selection in the location master.
  • B. Model a separate resource in the production data structure.
  • C. Model a separate inbound resource in the location master.
  • D. Model a goods receipt time in the material master.
  • E. Model a handling resource in the location master.

Answer: A,D,E

Explanation:
You can model goods receipt processing time in detailed scheduling by using one or more of the following options:
Model a handling resource in the location master: A handling resource is a special type of resource that represents the capacity required for goods movements within a location, such as loading, unloading, or staging. You can assign a handling resource to a location and define its availability and utilization.
You can also specify the handling time per unit of material for each handling resource. The system will then calculate the goods receipt processing time based on the handling time and the quantity of the material.
Model a transportation lane and carrier selection in the location master: A transportation lane is a master data object that defines the relationship between two locations in terms of transportation modes, means of transport, transit times, and costs. You can assign a transportation lane to a location and define the transportation mode, such as truck, rail, or air. You can also specify the carrier selection, which is a rule that determines the preferred carrier for each transportation mode. The system will then calculate the goods receipt processing time based on the transit time and the carrier selection.
Model a goods receipt time in the material master: A goods receipt time is a parameter that defines the time required to post the goods receipt for a material after it arrives at the location. You can specify the goods receipt time in the material master record for each material and location combination. The system will then add the goods receipt time to the goods receipt processing time.
You cannot model goods receipt processing time in detailed scheduling by using the following options:
Model a separate resource in the production data structure: A resource is a master data object that represents the capacity required for production activities, such as machines, labor, or tools. You can assign a resource to a production data structure, such as a bill of material, a routing, or a production version. However, a resource cannot be used to model goods receipt processing time, as it is not related to goods movements.
Model a separate inbound resource in the location master: An inbound resource is a parameter that defines the maximum number of inbound deliveries that can be processed at a location at the same time.
You can specify the inbound resource in the location master record for each location. However, an inbound resource cannot be used to model goods receipt processing time, as it is only a constraint for the number of deliveries, not the duration of the processing.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], pages 103-104;
[SAP Help Portal: Goods Receipt Processing Time].


NEW QUESTION # 44
You Have a scheduling agreement with a vendor, you want classic MRP to automatically create schedule lines in case of material shortage, what must you do?
Note: there are 2 correct answers to this question.

  • A. Set the creation indicator for purchase requisition on the initial screen of the MRP run.
  • B. Add the agreement to the quota arrangement and mark it for MRP relevance.
  • C. Add the agreement to the source list and mark it for MRP relevance.
  • D. Set the creation indicator for delivery schedule lines on the initial screen the MRP run.

Answer: C,D


NEW QUESTION # 45
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up to the maximum stock level.
  • B. Fill up to the safety stock level.
  • C. Fill up based on the lot size procedure.
  • D. Fill up to the reorder stock level.

Answer: C

Explanation:
In reorder point planning, the system compares the available stock with the reorder point to determine the net requirements. If the available stock falls below the reorder point, the system triggers a procurement proposal for the material. The quantity of the procurement proposal depends on the lot size procedure that is defined in the material master. The lot size procedure determines how the system calculates the order quantity based on factors such as demand, costs, and storage space. There are different types of lot size procedures, such as static, periodic, or optimum lot size. References: [Production Planning with SAP S/4HANA], page 156; [SAP Help Portal: Lot Size Calculation].


NEW QUESTION # 46
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

  • A. Purchase Order
  • B. Scheduling agreement schedule line
  • C. Planned Order
  • D. Production Order

Answer: B,C


NEW QUESTION # 47
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.

  • A. Order-related COC is beneficial in a flexible production environment
  • B. In pro duct-related COC, all costs are debited and credited to a product cost collector.
  • C. Product-related COC is used in manufacturing for co-products
  • D. In order-related COC, individual production orders do NOT have cost segments.

Answer: A,B


NEW QUESTION # 48
Which materials have a negative quantity in a bill of material or in a recipe?
Note: There are 3 correct answers to this question

  • A. Bulk materials
  • B. By-products
  • C. Co-products
  • D. Waste products
  • E. Continuous flow materials

Answer: B,C,D


NEW QUESTION # 49
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.

  • A. Production Version
  • B. plant
  • C. Material
  • D. Work Center

Answer: C,D

Explanation:
The Advanced Planning flag is a field that indicates whether a data object is relevant for planning with Production Planning and Detailed Scheduling (PP/DS) in SAP S/4HANA. PP/DS is a component of Advanced Planning that provides more precise and flexible planning capabilities for critical products and resources. You can set the Advanced Planning flag for the following data objects:
Work Center: This is a master data object that represents a location where operations are performed. A work center can have different capacities, such as machine, labor, or power, that are used for scheduling and capacity planning. You can set the Advanced Planning flag for a work center to enable it for PP/DS planning. This means that the work center can be used as a resource in PP/DS and its capacity can be optimized by PP/DS heuristics or optimization tools.
Material: This is a master data object that represents a product or a component that is produced, procured, or consumed in a business process. A material can have different views, such as basic data, MRP, sales, or production, that contain different attributes and parameters for planning and execution.
You can set the Advanced Planning flag for a material to enable it for PP/DS planning. This means that the material can be planned with exact times and quantities in PP/DS and its availability can be checked by PP/DS pegging.
The production version (B) and the plant (D) are not data objects that can have the Advanced Planning flag.
The production version is a master data object that defines the combination of a bill of material (BOM) and a routing or a production process model (PPM) for a material. The production version does not have a separate flag for PP/DS, but it inherits the flag from the material and the work center. The plant is an organizational unit that represents a physical location where materials are produced or stored. The plant does not have a flag for PP/DS, but it is assigned to a location in PP/DS that represents the geographical or logical grouping of plants for planning purposes. References
:https://blogs.sap.com/2018/02/12/ppds-for-sap-s4hana-advanced-planning-a-powerful-planning-and-scheduling-
https://learning.sap.com/learning-journeys/explore-integrated-business-processes-in-sap-s-4hana-/advanced-plan


NEW QUESTION # 50
When you create a sales order
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?

  • A. When MRP creates a dependent requirement
  • B. When you create a sales order
  • C. When MRP creates a planned order
  • D. When MRP creates a planned order

Answer: B

Explanation:
Planning strategy 40 (Planning with final assembly) is a make-to-stock strategy that uses planned independent requirements to trigger the procurement and production of the necessary assemblies and components before receipt of the sales orders. As soon as the sales order is received, it consumes the planned independent requirements and adjusts the master plan to suit the current requirements situation. This means that the important feature of this planning strategy is that you can react quickly to customers' requirements. The consumption of planned independent requirements can take place when you create a sales order, as well as when you change or delete a sales order. References: Planning with Final Assembly (40), Sample Scenario:
Strategy 40, Outlining Make-to-Stock Production


NEW QUESTION # 51
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. BOM item status
  • B. Manufacturing date
  • C. BOM header status
  • D. Lot size

Answer: B,D


NEW QUESTION # 52
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements?
Note: There are 2 correct answers to this question

  • A. In-house production time
  • B. Operation duration
  • C. Total replenishment lead time
  • D. Planned delivery time

Answer: A,B

Explanation:
Backward scheduling is a method of determining the order dates for components from dependent requirements by starting from the requirement date of the finished product and working backwards through the production structure. Backward scheduling considers the following time elements:
Operation duration: This is the time required to perform an operation on a resource, such as a work center or a machine. Operation duration is influenced by various factors, such as the quantity, the lot size, the setup time, the processing time, the teardown time, and the operation scrap. Operation duration is subtracted from the requirement date of the finished product to determine the start date of the operation.
In-house production time: This is the time required to produce a material in-house, from the start of the first operation to the end of the last operation. In-house production time is influenced by various factors, such as the routing, the work center, the production version,and the scheduling margin key. In-house production time is subtracted from the start date of the first operation to determine the order start date of the material.
Backward scheduling does not consider the following time elements:
Total replenishment lead time: This is the time required to procure a material externally, from the creation of the purchase requisition to the receipt of the goods. Total replenishment lead time is influenced by various factors, such as the planned delivery time, the goods receipt processing time, the release time, and the scheduling margin key. Total replenishment lead time is used in forward scheduling, not backward scheduling, to determine the order dates for externally procured materials.
Planned delivery time: This is the time required to deliver a material from the vendor to the receiving plant. Planned delivery time is maintained in the purchasing info record or the material master record.
Planned delivery time is a component of the total replenishment lead time, which is used in forward scheduling, not backward scheduling, to determine the order dates for externally procured materials. References: Backward Scheduling | SAP Help Portal, Scheduling | SAP Help Portal, SAP S/4HANA Production Planning and Manufacturing Certification Guide, page 77-78.


NEW QUESTION # 53
which of the following automation options can you use for production orders? Note: There are 2 Correct answers to this question?

  • A. you can use the production scheduling profile to automatically set orders toI technically complete
  • B. You can use mass processing to read PP master data for production orders
  • C. you can use mass processing to set production orders to technically complete
  • D. You can use trigger points to automatically create rework orders via confirmation.

Answer: C,D

Explanation:
You can use mass processing to set production orders to technically complete. Mass processing allows you to perform the same action for multiple production orders at once, such as changing the status, printing, or confirming. You can use the Set to Technically Complete action to close the production orders that are finished and do not require any further processing. This action updates the order status to TECO and prevents any further changes to the order12.
You can use trigger points to automatically create rework orders via confirmation. Trigger points are predefined events that occur during the execution of a production order, such as reaching a certain operation or quantity. You can assign actions to trigger points, such as creating a notification, a rework order, or a quality inspection. For example, you can use a trigger point to automatically create a rework order for defective goods when you confirm an operation. The rework order is linked to the original order and inherits the relevant data from it3 .
References:
1: SAP Help Portal: Mass Processing
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Process Orders
3: SAP Help Portal: Trigger Points
4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 6: Production Orders


NEW QUESTION # 54
......