NEW QUESTION 20
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?
- A. Substitute sequence
- B. Parallel sequence
- C. Alternative sequence
- D. Standard sequence
Answer: C
NEW QUESTION 21
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
- A. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- B. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.
- C. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
- D. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
Answer: A,B
NEW QUESTION 22
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
- A. Reducing the order quantity
- B. Confirming the operation
- C. Setting the status technically complete (TECO)
- D. Rescheduling the operation
- E. Posting the goods receipt for the production order
Answer: A,B,C
NEW QUESTION 23
You want to enhance the system statuses of a production order with user statuses.
How do you do this?
- A. Define the user statuses in the Customizing table of the system statuses.
- B. Define a status profile in Customizing and assign it to the production scheduling profile.
- C. Define the user statuses in the order type-dependent parameters.
- D. Define a status profile in Customizing and assign it to the order type.
Answer: D
NEW QUESTION 24
Which of the following master data can be used with process orders? (Choose three)
- A. Production/resource tools
- B. Production versions
- C. Resources
- D. Serial numbers
- E. Master recipes
Answer: B,C,E
NEW QUESTION 25
During the processing of production orders planned and actual costs are determined.
On which of the following objects can you collect these costs? (Choose two)
- A. Planned order
- B. Product cost collector
- C. Work center
- D. Production order
Answer: B,D
NEW QUESTION 26
Which of the following requirements for a manufacturing plant can be supported by using process manufacturing? (Choose three.)
- A. Manufacturing without orders.
- B. Master recipe-based manufacturing.
- C. Manufacturing in charge quantities.
- D. Material requirements planning for production resources.
- E. Variable calculation of material quantities (product output, material usage).
Answer: B,C,E
NEW QUESTION 27
Which of the following scheduling types can only be used in capacity planning?
- A. Forward
- B. Midpoint
- C. Only capacity requirements
- D. Backward
Answer: B
NEW QUESTION 28
Which of the following statements about the planning functions available in SAP ECC is correct?
- A. Material requirements planning (MRP) includes automatic capacity leveling.
- B. Long-term planning (LTP) is a long-term form of forecast planning.
- C. Master production scheduling (MPS) refers to preferred planning of important materials.
- D. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
Answer: C
NEW QUESTION 29
After a material has been included in a NETCH material requirements planning run you change its BOM (bill of materials).
Which of the following planning file entries for this material are set by the system?
- A. The BOM explosion indicator
- B. The BOM explosion and the NETPL planning indicator
- C. The BOM explosion, the NETCH, and the NETPL planning indicators
- D. The NETCH and NETPL planning indicators
Answer: C
NEW QUESTION 30
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
- A. A storage location may be assigned to different MRP areas.
- B. Make-to-order production is supported by storage location MRP areas.
- C. Subcontracting is supported by MRP areas.
- D. An MRP area may include different storage locations.
Answer: C,D
NEW QUESTION 31
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?
- A. Maintenance notifications
- B. Goods issues
- C. Confirmations
- D. Goods receipts
Answer: C
NEW QUESTION 32
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?
- A. N (non-stock item)
- B. M (phantom material)
- C. D (document item)
- D. E (external procurement)
Answer: A
NEW QUESTION 33
Which functions can be triggered before releasing a production order? (Choose three)
- A. Confirmation
- B. Selection of a BOM
- C. Selection of a routing
- D. Stock determination
- E. Scheduling
Answer: B,C,E
NEW QUESTION 34
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
- A. It posts planning results to the database automatically.
- B. It triggers multilevel bottom-up scheduling.
- C. It propagates exception messages from a component to the finished product.
- D. It calculates the delay time which may occur in planning.
Answer: D
NEW QUESTION 35
What functions can you use for sub operations? (Choose two)
- A. Costing
- B. Production/Resource tools allocation
- C. Capacity planning
- D. Material component allocation
Answer: A,C
NEW QUESTION 36
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?
- A. Activate the freely usable stock in the scope of check.
- B. Differentiated assignment of two different checking rules in check control.
- C. Enter an appropriate availability checking rule in the order type.
- D. Enter an appropriate availability checking group in the material master.
Answer: B
NEW QUESTION 37
In what sequence are the steps of material requirements planning performed in SAP ECC?
- A. 1. Net requirements calculation
2. Lot sizing
3. Scheduling
4. Determination of the procurement type - B. 1. Net requirements calculation
2. Lot sizing
3. Determination of the procurement type
4. Scheduling - C. 1. Calculation of safety stock
2. Lot sizing
3. Scheduling
4. Determination of the procurement type - D. 1. Availability check
2. Lot sizing
3. Determination of the procurement type
4. Scheduling
Answer: B
NEW QUESTION 38
What do you have to consider regarding consumption? (Choose two)
- A. Consumption is restructured with the planning run.
- B. Consumption takes place on the material level between the planned independent requirements and the planned orders.
- C. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
- D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
Answer: C,D
NEW QUESTION 39
Which of the following functions are available in SAP ECC when using capacity leveling? (Choose three)
- A. Lot size optimization
- B. Midpoint scheduling
- C. Setup time reduction
- D. Batch size optimization
- E. Finite capacity scheduling
Answer: B,C,E
NEW QUESTION 40
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)
- A. Production Scheduling Profile
- B. Material Master (Finished Product)
- C. Routing
- D. Material Master (Component)
- E. Work Center
Answer: C,D,E
NEW QUESTION 41
You want to plan a finished material using material requirements planning in an SAP ECC system. The resulting planned orders should be scheduled using basic date scheduling (not lead-time scheduling).
Which of the following properties for the resulting dependent requirements applies?
- A. If the individual material components are explicitly assigned to the operations of a routing, the requirement dates of the dependent requirements are scheduled at each start date of the operations.
- B. When a customer order is created for the finished material, the dependent requirements are automatically triggered for the components in the bill of material without a planning run.
- C. In multi-level backward scheduling, dependent requirements are triggered at the start date for the planned order of the finished material.
- D. In multi-level backward scheduling, dependent requirements are calculated to the exact second.
Answer: C
NEW QUESTION 42
Which of the following structural elements does a process order have? (Choose three.)
- A. Parallel sequences
- B. Characteristic-based process instructions
- C. Phases
- D. Item data
- E. Relationships
Answer: B,C,E
NEW QUESTION 43
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
- A. There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.
- B. Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.
- C. Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.
- D. Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.
Answer: A
NEW QUESTION 44
Which of the following functions does SAP Supply Chain Management (SCM) offer?
- A. Product development, safety, quality, and maintenance
- B. Communication with customers through different interaction channels
- C. Planning of supply chains across company boundaries
- D. Optimization of the procurement strategy with the supplier pool
Answer: C
NEW QUESTION 45
......
SAP PP Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books | Weighting |
|---|---|---|
| Lean Manufacturing (PP-REM, PP-KAB) | Outline the highlights of repetitive manufacturing and kanban. SCM300, SCM130 OR TSCM40, TSCM42 | 8% - 12% |
| Process Orders (PP-PI) | Identify specific properties of process orders. SCM300, SCM130 OR TSCM40, TSCM42 | < 8% |
| Production Orders Basics (PP-SFC) | Apply production order functionality. SCM310 OR TSCM40, TSCM42 | 8% - 12% |
| Master Data (LDM) | Set up master data for production planning and manufacturing. PLM114 OR TSCM40, TSCM42 | 8% - 12% |
| Material Requirements Planning (PP-MRP) | Explore material requirements planning functions. SCM240 OR TSCM40, TSCM42 | > 12% |
| Basics on SAP Business Processes (E-Learnings) | Outline the scope of SAP SCM business processes. TERP01, TERP50 OR TSCM40, TSCM42 | < 8% |
| Production Orders Advanced (PP-SFC) | Configure production order functionality. SCM310 OR TSCM40, TSCM42 | > 12% |
| Application Overview and Background | haracterize the interplay of master data, planning, ATP, and production functionality. TERP50, SCM240, SCM300, SCM130ORTSCM40, TSCM42 | < 8% |
| Material and Capacity Requirements Planning | Characterize production-relevant planning functionality. SCM240, SCM365 OR TSCM40, TSCM42 | > 12% |