
[Apr 26, 2023] Hitachi HQT-4180 Exam Dumps Are Essential To Get Good Marks
Latest Hitachi HQT-4180 Dumps with Test Engine and PDF (New Questions)
NEW QUESTION 21
A customer wants to change a production RAID Group from RAID 5 (7D+1P) to RAID 6 (6D + 2P) on a VSP G700 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
- A. The RAID Group must be deleted.
- B. The RAID level must be changed in the SVP Maintenance window.
- C. The RAID level must be changed in Storage Navigator.
- D. The RAID 5 Group must be put into DRU mode in Storage Navigator.
Answer: B
NEW QUESTION 22
What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?
- A. RAID 6
- B. RAID 5
- C. RAID 1+0
- D. RAID 1
Answer: C
NEW QUESTION 23
You are installing a new VSP G700 and are using the Initial Setup Wizard (ISW) for the network configuration.
Which set of IP addresses is configured with the ISW?
- A. IP addresses of all the ports and of the SVP
- B. IP addresses of management ports
- C. IP addresses of maintenance ports
- D. IP addresses of all the ports
Answer: B
NEW QUESTION 24
Which two reconfiguration activities are performed without interrupting host access on a VSP Gx00 system? (Choose two.) Choose 2 answers
- A. adding a DKB
- B. upgrading from G200 to G800
- C. upgrading from G200 to G600
- D. adding a DB60 drive tray
Answer: A,D
NEW QUESTION 25
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)
- A. Configure the Hitachi Remote Ops Monitor Agent.
- B. Manage multiple VSP Midrange storage systems.
- C. Manage virtual storage machines.
- D. Perform Self-Service Maintenance.
Answer: A,D
NEW QUESTION 26
A customer wants to upgrade their VSP E790 with a SAS Expansion feature.
What are three requirements? (Choose three.)
- A. Two additional Disk Boards (DKBs) have to be installed.
- B. Slots B of both controllers must be available for DKB installation.
- C. The SAS Expansion license has to be installed.
- D. Drive Boxes (DBs) with SAS interface have to be added.
- E. In Shared Memory, the Extension1 has to be enabled.
Answer: A,C,D
NEW QUESTION 27
A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)
- A. The RAID Groups in the pool must be formatted with encryption enabled.
- B. The controller board must support encryption.
- C. The RAID level of RAID Groups in the pool must be RAID 6.
- D. At least 20 GB of Shared Memory must be installed.
Answer: A,B
NEW QUESTION 28
Which manual should be used when performing maintenance actions on VSP midrange storage systems?
- A. Maintenance Manual
- B. Product Documentation Library
- C. Administrator Guide
- D. Service Guide
Answer: A
NEW QUESTION 29
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?
- A. two BM35 per system
- B. two BM35 per controller
- C. two BM45 per controller
- D. one BM45 per controller
Answer: C
NEW QUESTION 30
Which two statements are correct when adding cache to a VSP E590? (Choose two.)
- A. Cache Modules must be installed on the CM board.
- B. This is not supported online.
- C. CMG0 and CMG1 must have the same DIMM type.
- D. Cache modules must be installed in CMG1.
Answer: C,D
NEW QUESTION 31
The SVP of a VSP G900 system failed and you have been asked to replace it.
Which two items must be available to perform the replacement? (Choose two.)
- A. the microcode iso file with the correct software versions
- B. the iso file with the correct version of the Windows operating system
- C. the Hitachi Remote Ops Monitor Agent iso file
- D. the iso file with the correct version of Hitachi Ops Center
Answer: A,D
NEW QUESTION 32
You have to perform a firmware update containing new code for DKCMain, CHBs and drives on a VSP G900.
What are two requirements? (Choose two.)
- A. There should be no sparing processes running in the background.
- B. The Microprocessor utilization should be below 50%.
- C. The CHBs must be updated first.
- D. The Cache Write Pending rate should be below 30%.
Answer: A,C
NEW QUESTION 33
You need to replace a failing power supply (PS) in a VSP E590.
What is the correct procedure?
- A. Use the Maintenance Utility for blocking the controller, then replace the PS.
- B. Check if the status of the PS is blocked, and if yes, then replace it directly.
- C. Use the MPC for blocking the PS, then replace it.
- D. Use the Maintenance Utility for blocking the PS, then replace it.
Answer: C
NEW QUESTION 34
Which program is used to perform the "New Installation" procedure on a VSP midrange system?
- A. GUM
- B. BECK
- C. MPC
- D. Webconsole
Answer: A
NEW QUESTION 35
......
TestValid just published the Hitachi HQT-4180 exam dumps!: https://www.testvalid.com/HQT-4180-exam-collection.html
Pass Your HQT-4180 Exam Easily - Real HQT-4180 Practice Dump Updated: https://drive.google.com/open?id=1mm9JRz2bImPbsV3OnNwam0w7jTTHNHiN