A smooth preparation process beats a heroic one. TestValid's MB-320 online engine simulates the real test environment to make each Microsoft Dynamics 365 Supply Chain Management, Manufacturing practice session feel like the actual exam — structured preparation in the weeks before your date is the approach we recommend.
Microsoft MB-320 Exam Overview:
| Certification Vendor: | Microsoft |
|---|---|
| Exam Name: | Microsoft Dynamics 365 Supply Chain Management, Manufacturing |
| Exam Number: | MB-320 |
| Available Languages: | English, Japanese |
| Exam Price: | USD 165 |
| Passing Score: | 700 / 1000 |
| Real Exam Qty: | 40-60 |
| Exam Format: | Multiple response, Multiple choice, Scenario-based |
| Certificate Validity Period: | 2 years |
| Related Certifications: | Microsoft Certified: Dynamics 365 Supply Chain Management Functional Consultant Expert |
| Exam Duration: | 120 minutes |
| Recommended Training: | MB-320T00: Microsoft Dynamics 365 Supply Chain Management, Manufacturing |
| Exam Registration: | Microsoft Learn Exam Page Pearson VUE Registration |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored or onsite at Pearson VUE test centers; **Note: This exam retired June 30, 2023** |
| Pre Condition: | Recommended: Pass MB-300 (Microsoft Dynamics 365: Core Finance and Operations); no mandatory prerequisites |
| Official Syllabus URL: | https://learn.microsoft.com/en-us/credentials/certifications/exams/mb-320/ |
Microsoft MB-320 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Manage manufacturing processes | 20-25% | - Report production progress and completion - Create and release production orders - Schedule and execute production - Manage material consumption and route consumption - Handle batch and serial number tracking |
| Configure Dynamics 365 Supply Chain Management, Manufacturing | 35-40% | - Configure production control parameters - Configure resources and resource groups - Configure bill of materials and formulas - Configure production orders and batch orders - Configure routes and operations |
| Implement master planning for production | 10-15% | - Firm and process planned production orders - Configure master planning parameters - Manage safety stock and item coverage - Run and analyze planned orders |
| Implement other manufacturing features | 15-20% | - Configure process manufacturing - Configure lean manufacturing - Configure product compliance and batch attributes - Manage co-products and by-products - Implement warehouse integration for manufacturing |
Practical Answers for Microsoft Dynamics 365 Supply Chain Management, Manufacturing Candidates
At present, the MB-320 exam requires a passing score of 700 / 1000 and costs USD 165 to register. Microsoft controls both figures, so confirm them on the official site before you book.
The latest exam information lists 40-60 questions for the MB-320 exam, to be completed in 120 minutes minutes. Rehearsing under these conditions in the online engine is the closest thing to sitting the real test.
The Microsoft Dynamics 365 Supply Chain Management, Manufacturing blueprint is organized into these principal domains:
- Configure Dynamics 365 Supply Chain Management, Manufacturing (35-40%)
- Implement master planning for production (10-15%)
- Manage manufacturing processes (20-25%)
Additional domains follow in the full official outline, and our bank spans them all.
Microsoft recommends these official training options:
If formal classes fit your budget and calendar they add structure; otherwise, disciplined self-practice with a current bank covers the same ground.
A team of professional IT experts and certified trainers who focus on this exam field — and who keep the MB-320 bank under constant updating so every candidate prepares smoothly. Every answer is expert-verified, and you can check the accuracy yourself with a free demo before buying. The online test engine deserves special mention: it simulates the actual test environment, supports Windows, Mac, Android, and iOS, carries no installation limits, and lets you practice without limits of time or location — a smooth preparation process for office workers who cannot attend classes.
Upon successful payment, our system automatically sends the product to your mailbox — typically within about a minute — with an instant download link on screen. If nothing arrives within two hours, check your spam folder and contact support. Once purchased, updates are free for 365 days: whenever a new version is released, the updated MB-320 bank is sent to your email immediately. A 50% renewal discount applies after the period ends.
Microsoft specifies the following prerequisites for the Microsoft Dynamics 365 Supply Chain Management, Manufacturing: Recommended: Pass MB-300 (Microsoft Dynamics 365: Core Finance and Operations); no mandatory prerequisites.
Verify the details on the official certification page before registering.
Documented and honored. If you fail the corresponding exam within 60 days of purchase, send a scanned copy of your enrollment slip and your official Score Report PDF within two days of the exam date; verified claims are refunded in full within seven days. Exclusions: exams taken within three days of purchase, candidate names that differ from the payer, and free or expired products. If you have another exam in mind, you can instead exchange your product for two others of equal value at no charge.
Registration runs through the official channels below:
Choose a test center or online appointment, and book early to keep your preparation timeline comfortable.
Microsoft Dynamics 365 Supply Chain Management, Manufacturing Sample Questions:
A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. No resources
- B. No route
- C. No BOM
- D. No consumption
- E. No cost price
Correct Answer: B,C,E 🗳️
Explanation: Only visible for TestValid members. You can sign-up / login (it's free).
You are responsible for training the operations staff on production transactions in Dynamics 365 for Finance and Operations. The company uses backflushing for material consumption principles.
You need to train the operators on how to report unintended scrap.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. Report an additional good quantity at Report as finished
- B. Report an error quantity at Report as finished
- C. Report additional time in route card journal
- D. Post additional materials in a picking list journal
Correct Answer: B,D 🗳️
A company implements Dynamics 365 for Finance and Operations.
Production orders are generated for products directly from projects. You create the following production order:
Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.
Correct Answer:

A company that uses Dynamics 365 Supply Chain Management is evaluating whether to implement the Transportation management (TMS) or Landed cost modules to track shipping costs. The company transfers materials between warehouses in both the US and China.
The company uses the following shipping processes:
* Company-owned trucks to deliver to customers within a 30-mile radius for small deliveries.
* Third-party cartage services to transfer inventory between the various company warehouse locations outside of North America.
* Containers to optimize importing and cost efficiencies of raw materials from suppliers in China.
You need to recommend a module for each shipping process.
Which module should you recommend? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Correct Answer:

You are a functional consultant for Contoso Entertainment System USA (USMF).
The factory of USMF has a shift that runs during the hours of 06:00 to 14:00 from Monday to Friday.
You plan to create a calendar that will use the shift.
You need to create the factory shift in the system.
To complete this task, sign in to Dynamics 365 portal.
Correct Answer:
See explanation below
Explanation:
You need to configure a working time template to define the hours 06:00 to 14:00. Then you set up a working time calendar to define the working days. For this question, we just need to configure the working time template.
Click Organization administration > Common > Calendars > Working time templates. Click New to create a new line.
On the Overview tab, in the Working time template field, enter an alphanumeric identifier of up to 10 characters.
In the Name field, enter a descriptive name for the template.
Select the tab that corresponds to the day of the week that you want to define working hours for, and click Add to create a new line.
In the From field, enter the starting time for the day or the period.
In the To field, enter the ending time for the day or the period. This can be defined as a day, a shift, or a temporary stop in operation, such as a lunch period.
In the Efficiency field, enter the efficiency percentage.
In the Property field, select the property for the selected day's working time template.
Repeat steps 4 through 8 for each day of the week.





725 Customer Reviews

